Home Construction Projects
|
The Department of Public Works is responsible for construction efforts conducted by Town staff and contracted forces.
For projects to be contracted out, the project design is completed by Town staff or consultants. Proposals for the construction of the project is advertised and interested construction companies submit bids for evaluation.
To provide comments regarding projects under construction, please visit the Contact Us page.
The following projects are currently under construction:
Right-of-Way Utilization Permits |
The Department of Public Works regulates all construction activity within the Town Right-of-Way. Construction, road closures, or restriction of on-street parking or sidewalks require a permit issued by the Department. |
Click To Download: ROW Utilization Permit |
|
 |
FY 07-08 Pavement Management Program |
The Town has adopted a comprehensive pavement program for the FY07-08 fiscal year. The Department shall be conducting work in several locations identified on the PMP Map. |
Click To Download: PMP Schedule |
|
|
Snow Removal |
The Town of Front Royal maintains the Town streets during storm events. Please see the attached information. |
Click To Download: Snow Removal Q&A |
|
|
Sewer Main Slip Lining |
The Town has contracted with A&M Liners to install a lining into existing sewer mains. When work is to occur, door hangers shall placed alerting citizens to the work. Please do not use water during this work. The sewer main will be temporarily blocked while the lining is installed. This work shall reduce groundwater infiltration into the sewer system. |
Click To Download: FY06-07 Sewer Main Lining Map |
|
 |
2007 Leaf Collection |
The Town has been divided into four sections for leaf collection, with the first zone collection beginning on November 5. Town staff shall place " No Parking – Leaf Collection" signs on the streets in the zone to be collected the Friday before that Zone's collection. Residents are requested to honor the "No Parking" request by parking in driveways or other off-street parking locations to allow leaf collection.
When you see the leaf collection signs, please place all leaves on the grass-side of the curb or onto the sidewalk. Leaves shall be loosely gathered and not placed in bags. Please do not place leaves in the gutter, as this may impair stormwater flow if it should rain. If you place the leaves in bags, they will be collected on your weekly yard waste collection day. |
Click To Download: Leaf Zone Map |
|
|
|
|
|